Sub-agent Grok 4.6 usage billed to parent Opus 5 in Project mode

In Project mode, I use Opus 5 for the main conversation and have it spawn a sub-agent for another task, with that sub-agent explicitly set to Grok 4.6. At runtime I can confirm the sub-agent is actually running on Grok. After the sub-agent finishes and Opus 5 outputs the result, Usage attributes the Grok 4.6 usage to Opus 5, which creates unexpected extra cost.

Is this expected behavior, or a billing/usage attribution bug?

request id: 80782173-ef59-4de4-adcd-b83ffd7bc983

agent id: bc-fd996bae-428f-5176-95c2-43720c898e31

Hey @John_Chen1, thanks for the report, and for confirming at runtime that the sub-agent was actually on Grok 4.6.

Quick reassurance first: your total charges are correct. Each request is priced on the model that actually ran it, so the sub-agent’s Grok 4.6 work was charged at Grok rates, not Opus 5 rates.

To make sure I’m looking at exactly what you’re seeing, could you share a screenshot of the Usage entry in question, i.e. the row where the Grok 4.6 sub-agent’s cost is showing under Opus 5? That’ll let me confirm which view is mislabeling it and pass it along with the right detail.

Hi Mohit, these are screenshots of usage.

Thanks @John_Chen1, the screenshots confirm it. The Grok 4.6 work was charged at Grok rates in its own rows. That Opus 5 row under the sub-agent is the Project’s own follow-up turn, where it wakes on Opus 5 to read the result and plan next steps, just listed in the wrong place, which makes the sub-agent look pricier than it was. Nothing is double-charged, your total is correct, and we’ve flagged the mislabeling. A cheaper Project model lowers that follow-up cost meanwhile.